ADU Services
ADU Design & Permits
Navigating LA's ADU permitting process doesn't have to be stressful. Our in-house design team creates your plans and manages every submission — so you don't have to deal with the city.
Design Services
- →Site analysis and feasibility study
- →Architectural floor plans and elevations
- →3D renderings of your finished ADU
- →Structural engineering drawings
- →Title 24 energy compliance reports
Permitting Services
- →LADBS permit application and submission
- →Plan check coordination and corrections
- →Zoning compliance verification
- →HOA approval support (if applicable)
- →Final inspection scheduling
Common Questions
How long does permitting take in LA?
Standard ADU permits take 3–6 months. Pre-approved plans through the LADBS standard plan program can reduce this to 4–8 weeks.
Do I need an architect?
Yes — permitted ADUs require licensed architectural drawings. Our in-house team handles this as part of the full project.
What's included in the permit fee?
City fees vary by ADU size and type. We provide a full fee estimate during your free property review.
GET STARTED
Schedule Your Free Property Review
Fill out the form below and we'll help evaluate your property and identify the right ADU solution for your goals.
